We removed the bottom portion of the driveway. After cleaning up job related debris we applied tack-coat adhesive to the bottom layer of existing asphalt. Finally the crew installed 1.5" of fine driveway top then, and rolled with a vibratory 4 ton roller for proper compaction.
EverBlak, Inc.
Joe Dibattisto
955 Buffalo Road Suite #7
Rochester, NY 14624
Phone/fax 585-286-1881
www.everblak.com
EverBlak, Inc.
Joe Dibattisto
955 Buffalo Road Suite #7
Rochester, NY 14624
Phone/fax 585-286-1881
www.everblak.com
No comments:
Post a Comment